What GCs need from a plumbing sub
A bid that matches the drawings and calls out exclusions clearly. Enough crew to hit underground, top-out and trim dates. Permits and inspections handled without chasing. Submittals on time. And a plumber who flags problems, like an undersized interceptor or a sewer lateral that needs a camera, before they become change orders.
Project types
Restaurant finish-outs with grease interceptors, floor sinks and gas piping. Medical and dental offices with exam sinks and equipment connections. Office and retail restrooms and break rooms. Ground-up commercial projects. Remodels in occupied buildings with phased shutdowns.
Getting a bid
Send the drawings, the schedule and any known existing conditions through the request form. Include the bid due date and whether the work is in the City of Austin or a surrounding city.
Permits, inspections and approvals in Austin
In the City of Austin, plumbing permits are requested by a licensed plumbing contractor registered with the City. The work is inspected in stages, typically underground, top-out and final. Restaurants need one more approval: Austin Water reviews the grease interceptor before it's installed. Size it early with Austin Water's fixture-unit method, which our grease trap size calculator uses, so the slab isn't poured around the wrong interceptor.
Commercial sewer service lines from the right-of-way to within 5 feet of the building need a stand-alone Commercial Plumbing Service Line Permit. Work closer to the building isn't covered by that permit and is permitted as regular plumbing work.
Backflow at the end of the job
Under Texas rules, a new backflow assembly is tested when it's installed. Some cities make that test part of closing out the job. Georgetown, for example, requires backflow test results as part of the building final inspection on commercial work. Build the test into the closeout schedule, and make sure the report goes to the utility for that address.
Services requested most often
- Tenant Finish-Out & New Construction
- Grease Trap Cleaning & Installation
- Sewer Line Repair & Camera Inspection
- Commercial Water Heaters & Boilers
- Backflow Testing & Repair
- Drain Cleaning & Hydro Jetting
General Contractors plumbing FAQ
How fast can we get a plumbing bid?
It depends on the project size and the bid date. Send complete drawings and the due date with your request so the contractor can confirm whether they can meet it.
Who pulls the plumbing permit on a finish-out?
The licensed plumbing contractor pulls the plumbing permit for their scope and schedules the plumbing inspections.
What existing conditions should we check before bidding a restaurant finish-out?
The existing grease interceptor (size and condition), the sewer lateral (camera it), the gas service capacity and the water service size. They drive most restaurant plumbing costs and change orders.
Sources
- City of Austin Development Services: permit types
- Austin Water: Industrial Waste Plan Review
- Austin Water: Grease Trap Sizing Design Criteria
- City of Austin Development Services: Apply for a Standalone Permit
- City of Georgetown: backflow testing (askGTX)
- TCEQ: Cross-Connection Control and Backflow Prevention



